operations@unigulfems.comFree site visit · Same-day quotation
Call or WhatsApp +974 5556 3941 · Doha, Al Rayyan, Al Wakrah, Lusail, Al Khor, Mesaieed, Ras Laffan — all of Qatar


Projects & gallery
A selection of the work UniGulf Traffic delivers across Qatar — highway lane lines, car parks and warehouses, airport aprons, cycle tracks, road studs and signage — for contractors and facility teams including Titanium, Thermal Arabia, TDG Serv, Ooredoo, HBK and FMM.
Free site visitSame-day quotation10+ years in Qatar


What we deliver
Every project below is set out from approved drawings, applied by our own crews with our own equipment and inspected before handover. Most are delivered inside a closure window, a holiday shutdown or a handover date — the constraint that decides which material and which crew we send. Client names and project references are provided on request for tenders and prequalification.
Lane lines, edge lines, arrows, chevrons and roundabouts in hot thermoplastic on expressways, arterial roads and industrial estate roads, applied at night inside lane closures.
Mall, tower, hospital and compound car parks — bays, numbering, arrows, accessible and EV bays — often combined with epoxy flooring on basement decks.
Forklift lanes, pedestrian walkways, hatching and colour zones in epoxy and MMA for logistics facilities, cold stores and factories.
Runway, taxiway and apron markings and rubber removal delivered inside closure windows with airside-trained crews.
Coloured cycle lane surfacing, symbols and crossings on corniche, park and campus schemes.
Reflective road studs and traffic signage supplied and installed with the markings on new roads and developments.
Gallery
Photographs show UniGulf Traffic crews and typical works. For project-specific references, drawings or before-and-after records, contact the operations team.












How we work
An engineer measures the site, checks the surface condition, confirms the layout against your drawings or the QCS/Ashghal standard and agrees access, traffic management and working hours.
Traffic control is placed, old or faded lines are removed if required, and the surface is cleaned, dried and primed where the material specification calls for it.
Markings are set out and applied with our own machines — thermoplastic, cold paint or MMA — with glass beads dropped on for retro-reflectivity and thickness checked during the run.
Dimensions, colour, thickness and reflectivity are checked, snags are closed the same visit, and you receive a handover with material data sheets for your submittal file.
FAQ
Straight answers for QS teams, consultants and facility managers. Anything else — call +974 5556 3941.
Free site visit · Same-day quotation
Send the site location, approximate area or number of bays and any drawings. We survey, confirm the specification and send an itemised quotation — usually the same working day.
Own crews & equipmentNight-shift capable10+ years in Qatar